Our Utilities department frequently updates existing water connections and pipelines with the latest technology. This ensures that our residents have access to clean water with minimal waste.
Replace the existing system with City standard water mains, valves, and hydrants to improve system reliability, flows and pressures within the Bermuda Way Neighborhood.
Rehabilitation of existing water system in the S. Martin Luther King Drive neighborhood. This project will replace the existing system with City standard water mains, valves, and hydrants to improve system reliability, flows, and pressures.
Subsurface portion of proposed 1,500 gpm well on City of Modesto owned parcel at 2501 Brenner Way, Modesto, CA in Stanislaus County to replace well 226 that was permanently decommissioned in accordance with state procedures in October 2016.
Project developed and constructed a new corporation yard for the Water Services Division, Parks Operations and Finance Stores Division through the design-build construction method.
Provide site improvements and well equipping for Well 70 (Replacing Well 271) located at the northwest corner of Stewart Rd and McHenry Avenue in Del Rio, CA
Construction of 0.25 million gallon steel water tank, a 1,000 gallon per minute well production pump, a 2.45 million gallon per day booster pump station, a 1.4 acre foot retention basin, and a 16 inch transmission main.