Heavy Duty Shop Expansion

Heavy Duty Shop ExpansionDates

Project Start Date

August 2020

Anticipated End Date

Completed

Location

1609 8th Street, Modesto

Funding 

Fleet Facility Funds

Strategic Commitment

Providing a Vibrant Infrastructure & Sustainable Environment

Project Summary

Fleet Services is currently divided into two buildings and three shops.  This new shop building will be one step closer to having all of Fleet Services in one building.

Project Description

This project consists of a pre-fabricated metal building that will be the home of 8 heavy duty vehicle bays as well as storage space for tools and equipment.  The shop is designed with 3 in-floor lifts that will be capable of lifting our heaviest and tallest vehicles with the push of a button.  This shop will allow for the safe repair of all of fleets equipment in a state of the art facility and enable fleet staff to easily travel from shop to shop to help where the immediate demand is.  This shop will not only make Fleet Services more efficient but help us work safer as well.