What water fee pays for the construction of the specific water main that extends down a public right of way to serve a specific property?
  • Water Main Installation - Residential, Commercial or Industrial

Generally, this fee is charged at the time that the building permit is issued for the property.  This fee applies to the old city area (Zone 1) and in the former Del Este area (Zone 2) where the City has significantly strengthened the infrastructure.  This fee may be waived in the property owner has already participated in the cost of the water main service the property.

Show All Answers

1. What type of condition do Single-family residences qualify for the 5/8 inch connection fee?
2. What water fee pays for the time and materials required to install the water service from the City water main to the property line?
3. What water fee pays for the construction of the specific water main that extends down a public right of way to serve a specific property?
4. What water fee pays for the time required to connect a new water main to an existing "live" main for making the connection from a new subdivision to an existing water main?
5. What water fee pays for the time and materials required to install a fire hydrant in the public right-of-way?
6. What water fee pays for the removal and replacement of pavement in the street or alley required for the installation of a water service?
7. What water fee pays for the time required to prepare an Outside City Limits Agreement, including review of costs and administrative preparation?
8. What water fee pays for the time required to perpare a water reimbursement agreement, including review of costs and administrative preparation?
9. What water fee includes backflow?
10. What water fee includes strainer?